Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Levels configure the different stages or lanes that a workflow process will go through.

...

Details:

Table of Contents


Image RemovedImage Added

Level

This is a system generated number and cannot be changed.  Moving the levels up and down will automatically renumber this value so that the levels are always sequential starting with 0.  Changing the order of the levels can be achieved by dragging and dropping as shown below:
Image Removed
Image Added

Level Name

This specifies the name of the level and is shown in the Process Flow diagram at the top as shown below.

 

...


Info
Program /IQX/ESCALATIONS_PROCESS should be scheduled according to your needs. It can be run for all Forms, or can be schedule per Form using a variant. A recommended scheduling period would be every 15 minutes.


Standards / conventions / best practice guide

  • Level Name should be a noun, and the Status should describe that noun. For example:

         image2019-11-27_16-6-30.pngImage Added

  • Please take note that the Level Name and Status fields are used in reporting and audit trail information, and should therefore be chosen carefully.